Taites Cairn Tunnel

A-Pex have recently won the contract for the removal of the Thermoplastic lines in the Taites Cairn Tunnel that runs from Diamond Hill to Sha Tin. The contract is 32000 linear metres and will finished over the course of 2 months.

This contract will be done with the newly purchased VA25 Twin (Pictured). This Swiss made machine uses 2 drums. The first drum removes the thick part of the thermoplastic while the second drum cleans the remainder of the surface to leave a coarse, clean finish. This machine is up to 12 times quicker than the methods commonly being employed in Kong Kong presently.

top