100 Texaco Road Industrial Building

Noise was a problem for the owners of the industrial building. They had tenants in the floors above and below, and since some operating 24 hours a day a noisy job was out of the question.

Over Easter 2007, A-Pex sent in a VA 30SH machine – A 300 kg hydraulically propelled floor, equipped with a special drum that shatters each tile into small pieces. By the time the neighbouring offices returned to work after the holiday the 2600m2 job had been completed.